| Offered in liquid and gas configurations for low-flow detection, the general purpose flow switch is a great choice for a diverse range of relatively clean, non-coating media. Liquid examples include deionized water and sulfuric acid. The 1A relay provides a reliable switch interface with remote devices such as a PLC, SCADA or alarm. The short sensor is intended for use in pipe or ducting from 1/2" to 11/2"; the long sensor is applied in 2" and up. The liquid switch set point may be adjusted from 0.04 to 3 fps, and the gas switch from 1 to 90 fps. |
|
|
|
Adjustable set point with LED for flow or no-flow status indication |
|
Solid state sensor is not damaged by over-ranging flow velocities |
|
PP-Ryton or PVDF sensor rated NEMA 4X or IP65 |
|
1A relay selectable NO or NC via power supply wiring polarity |
|
Compatible with Flowline alarm, controller and fitting accessories |
|
| Tech Tip |
| The clear set point adjustment knob doubles as an LED to indicate the flow status. Its calibration made simple. |
 |
|
|
Specifications
|
|
Set point range:
|
FT10: 0.04 to 3 fps (0.012 to 0.91 mps)
GT10: 1 to 90 fps (0.3 to 27 mps)
|
|
Repeatability:
|
± 0.5% of set point
|
|
Supply voltage:
|
12-36 VDC
|
|
Contact type:
|
(1) SPST relay
|
|
Contact rating:
|
60 VA
|
|
Process temp:
|
F: 32° to 140°
C: 0° to 60°
|
|
Pressure:
|
150 psi (10 bar)
|
|
Cable length:
|
10' (3m)
|
|
Sensor rating:
|
NEMA 4X (IP65)
|
|
Process mount:
|
3/4" NPT (3/4" G / Rp)
|
|
Sensor material:
|
PP-Ryton® / PVDF
|
|
Classification:
|
General purpose
|
|
|
|
|