| The general purpose two-wire capacitance transmitter provides contact level measurement up to 10' or 3m, and is ideally suited for clean, water-based, non-coating corrosive liquids with constant chemistry. The transmitter is typically selected for pressurized day tank and process vessel applications. Media examples include nitric and hydrochloric acid. |
|
 |
|
|
FEP probe for use with highly corrosive acid solutions |
|
Self grounding probe does not require reference in plastic tanks |
|
Easy potentiometer calibration with power LED and span invert switch |
|
Small probe mounts in 3/4" fitting |
|
|
|
| Tech Tip |
| For remote relay control and indication, package your level transmitter with the LC52-1001 continuous relay controller. The spanable controller features up to three process set points with two relay outputs and an isolated 4-20 mA repeater.
|
 |
|
|
|
Specifications
|
|
Range:
|
1' to 10' (30cm to 3m)
|
|
Accuracy:
|
± 1% of full span
|
|
Conductive range:
|
> 100 microohms
|
|
Dielectric range:
|
> 20 constants
|
|
Supply voltage:
|
14-36 VDC
|
|
Signal output:
|
4-20 mA, two-wire
|
|
Calibration:
|
Potentiometer
|
|
Process temp:
|
F: -40° to 158°
C: -40° to 70°
|
|
Pressure:
|
75 psi (5 bar)
|
|
Enclosure rating:
|
NEMA 4X (IP65)
|
|
Probe material
|
FEP
|
|
Conduit:
|
1/2" NPT
|
|
Process mount:
|
3/4" NPT (3/4" G)
|
|
Classification:
|
General purpose
|
|
|
 |