Application
The general purpose intrusive capacitance level switch is an excellent choice for a wide range of relatively clean, aqueous based conductive liquids with non-coating and/or scaling characteristics. Media examples include hydrogen peroxide and chromic acid. The 1A relay provides a reliable switch interface with remote devices such as a PLC, SCADA or alarm. The submersible sensor is universally mounted through the wall or inside the tank.
Features
PP or PFA sensor and cable rated NEMA 6 or IP68
Available in short and long sensor lengths for flexible installation
1A relay selectable NO or NC via power supply wiring polarity
Compatible with Flowline alarm, controller and fitting accessories
Tech Tip
The NO or NC relay state is selected via the power supply wiring polarity. Its level wiring made simple.
Specifications
Orientation:
Universal
Repeatability:
± 0.5 mm in water
Supply voltage:
12-36 VDC
Contact type:
(1) SPST relay
Contact rating:
(1) 60 VA
Process temp:
F: -40° to 176°
C: -40° to 80°
Pressure:
150 psi (10 bar)
Cable length:
10' (3m)
Sensor rating:
NEMA 6 (IP68)
Process mount:
3/4" NPT (3/4" G)
Sensor material:
PP / PFA
Classification:
General purpose