| This general purpose liquid or gas switch package provides a complete solution for low flow pump or process protection with a 10A compact relay controller. The optional flash alarm brings immediate attention to low flow conditions. The short sensor is intended for use in pipe or ducting from 1/2" to 1 1/2"; the long sensor is applied in 2" and up. The product is broadly selected for low or no-flow applications. Specify the appropriate sensor technology, length and material. |
|
 |
|
|
Fail-safe relay control of pumps and valves with 0-60 second time delay |
|
Optional strobe brings immediate attention to flow alarm conditions |
|
PP or PVDF wetted material for challenging corrosive fluids |
|
| Tech Tip |
| The AC powered relay controller has a 10A relay, adjustable time delay, LED indicators, NO or NC invert switch and UL fire retardant PP enclosure. |
 |
|
|
|
Specifications
|
|
Set point range:
|
FT10: 0.04 to 3 fps (0.012 to 0.91 mps)
GT10: 1 to 90 fps (0.3 to 27 mps)
|
|
Repeatability:
|
±0.5% of set point
|
|
Supply voltage:
|
120/240 VAC @ 50-60 Hz.
|
|
Contact type:
|
(1) SPDT relay
|
|
Contact rating:
|
250 VAC @ 10A
|
|
Process temp:
|
F: 32° to 140°
C: 0° to 60°
|
|
Pressure:
|
150 psi (10 bar)
|
|
Wetted material:
|
PP-Ryton®/PVDF
|
|
Conduit entrance:
|
1/2" NPT
|
|
Enclosure rating:
|
NEMA 4X (IP65)
|
|
Process mount:
|
3/4" NPT (3/4" G)
|
|
Classification:
|
General purpose
|
|
 |
|