< Spec-Tech : Flowline - Switch-Pro with Compact Relay Controller <
Spec Tech Industrial
Back to Level Switches

Buy Your Industrial Control Products Here!

Flowline

Switch-Pro™ with Compact Relay Controller

Application
Installed through the side wall, this general purpose high or low level switch package includes a 10A compact relay controller for pump or valve actuation with an optional flash alarm. The product is typically selected for bulk storage, day tank and process vessel applications. Specify the appropriate sensor technology and material.

Features
Fail-safe relay control of pumps and valves with 0-60 second time delay
PP, Ryton® or PFA wetted material for challenging corrosive liquids
Optional strobe brings immediate attention to tank alarm conditions
Offered in 2 sensing technologies for broad application coverage
Tech Tip Sensor Technology
The AC powered relay controller has a 10A relay, adjustable time delay, LED indicators, NO or NC invert switch and UL fire retardant PP enclosure. The optional Strobe Alert flashes during a high or low level alarm condition.

Ultrasonic
Broadly applied in chemical, solvent, hydrocarbon and light weight oil media

Vibration
Typically applied in wastewater media with light coating and/or foaming characteristics

Specifications
Orientation:
± 20° horizontal
Supply voltage:
120/240 VAC @ 50-60 Hz.
Contact type:
(1) SPST relay
Contact rating:
250 VAC @ 10A
Process temp:
F: -40° to 176°
C: -40° to 80°
Pressure:
150 psi (10 bar)
Wetted material:
AU13: PP/PFA
AZ13: Ryton®
Conduit entrance:
1/2" NPT
Enclosure rating:
NEMA 4X (IP65)
Process mount:
3/4" NPT (3/4" G)
Classification:
General purpose

Order

2509 Cassens Drive
Fenton, MO 63026
Toll Free: (888) SPECTECH
Phone: (636) 537-0202
Fax: (636) 537-1405
E:mail: sales@spectechind.com