< Spec-Tech : Flowline - Switch-Pak Single Point Level Switch Fitting <
Spec Tech Industrial
Back to Level Switches

Buy Your Industrial Control Products Here!

Flowline Level Switches

Switch-Pak™ Single-Point Level Switch Fitting

Application
The single-point fitting enables users to install and extend a Flowline level switch through the top wall of the tank. Offered in PVC, PP and PVDF materials, the fitting is typically applied in bulk storage tanks, day tanks and waste sumps. Each fitting is built custom to your requirements. Select the appropriate material based upon your application liquid and specify the A-dimension, taking into consideration the installed sensor length.
Features
Thermal or solvent welded fitting is built to your switch insertion length
Offered in PVDF, PP and PVC material for maximum chemical compatibility
Tech Tip
For easy field assembly, order the LM45-70_1-00" PVC plug fitting and sensor adapter. Solvent weld a 3/4" PVC schedule 40 pipe between the parts to the desired length. Its level installation made simple.
Specifications
Fitting
Length:
6" to 10' (15cm to 3m)
Process temp:
F: -40° to 176°
C: -40° to 80°
Pressure:
150 psi (10 bar)
Fitting material:
70_1: PVC
10_1: PP
50_1: PVDF
Process mount:
2" NPT (2" G)
Sensor adaptor:
3/4" NPT (3/4" G)
Side mount
Bracket material:
PP
Female threads:
1001: 2" NPT
1051: 2" G
Tank insulation:
Bolt or plastic weld

Order
2509 Cassens Drive
Fenton, MO 63026
Toll Free: (888) SPECTECH
Phone: (636) 537-0202
Fax: (636) 537-1405
E:mail: sales@spectechind.com