Application
Offered in CSA approved intrinsically safe or general purpose configurations, this switch package provides up to four adjustable level switch points with a 1A relay or dry contact closure interface for remote devices such as a PLC, SCADA or alarm. The product is typically selected for atmospheric day tank, process vessel and waste sump applications. Specify the appropriate sensor technology and assembly dimensions

Features
Corrosive multi-point level detection with contacts for PLC or control input
Offered in 3 sensing technologies for broad application coverage
Rugged PP construction for use in challenging corrosive environments
Adjustable level switches make field adjustment fast and simple
PP junction box with swivel base
Tech Tip Sensor Technology
The compact junction box is constructed of UL approved fire retardant PP and comes pre-wired with a 12-pole terminal strip. Its level made simple.

Ultrasonic
Broadly applied in chemical, solvent, hydrocarbon and light weight oil media

Vibration
Typically applied in wastewater media with light coating and/or foaming characteristics

Buoyancy
Best applied in clean water or water-like chemical media that is non-coating or scaling
Specifications
Length:
8" to 10' (20cm to 3m)
Switch points:
1 to 4 (field adjustable)
Process temp:
F: -40° to 176°
C: -40° to 80°
Pressure:
Atmospheric
Wetted material:
PP (20% glass filled)
Conduit entrance:
Single, 1/2" NPT
Enclosure rating:
NEMA 4X (IP65)
Process mount:
2" NPT (2" G)
Supply voltage:
12-36 VDC
Contact type:
(1) SPST relay
Contact rating:
GP: 60 VA
IS: 32 VDC @ 0.5A
Classification:
Intrinsically safe
Supply voltage:
12-30 VDC
Contact type:
(1) SPST relay
Contact rating:
60 VA
Classification:
General purpose
Contact type:
(1) SPDT reed
Contact rating:
15 VA
Classification:
General purpose