| Factory calibrated, the general purpose indicator reads 0-100% of span with two or four sensor input channels. A single push button allows users to scroll through their active channels. With the optional MicroCal PC calibration kit, users can customize engineering units, configure FET alarm set points, and/or linearize the volumetric measurement of odd shaped tanks. Select the 2 channel for loop insertion with PLC's and the 4 channel for stand alone indication. |
|
|
Compatible with two-wire level transmitter, switch and leak detection sensors |
|
Alarms can be configured for high level, low level, out-of-bounds level or leak |
|
Compact NEMA 4X enclosure supports panel and wall mount installations |
|
Adjustable LED backlight for use at night or in dimly lit applications |
|
| Calibration |
| Your indicator may be configured in less than a minute using the MicroCal PC calibration kit. User configuration files are retained for indicator cloning and record keeping. It's level indication made simple! |
|
|
|
Specifications |
|
Display type : |
LCD, 5-digit |
|
Display units: |
Factory cal: % of span
PC cal: engineering* |
|
Display output: |
Transmitter: 0-99999
Switch: Good / Alarm* |
|
Display backlight: |
LED bar (adjustable) |
|
Linearization:* |
2-16 point function |
|
Input channels: |
LI42: (2) 4-20mA
LI44: (4) 4-20mA |
|
Supply voltage: |
12-24 VDC |
|
PC-cal. interface:* |
USB® adaptor w/cable |
|
PC-cal. software:* |
MicroCal (Windows®) |
|
Memory: |
Non-volatile |
|
Alarm type:* |
LI42: (2) FET switches
with opt. audible chirp
LI44: (1) FET switch with opt. audible chirp |
|
Alarm set points:* |
1 point: alarm
2 points: out of bounds |
|
Switch rating: |
1A @ 24 VDC |
|
Switch output:* |
Normally open |
|
Operating temp.: |
F: -4° to 140°
C:-20° to 60° |
|
Cable length: |
10' (3m) |
|
Enclosure rating: |
NEMA 4X (IP65) |
|
Enclosure mat'l.: |
PC/ABS FR |
|
Classification: |
General purpose |
|
* Requires the LI96-1001 MicroCal calibration kit |
|
 |
|