| The general purpose controller provides single channel low flow switch automation with one sensor input. The optional flash alarm brings immediate attention to flow alarm conditions. Package the controller with our liquid or gas flow switch sensors. |
| |
|
|
Fail-safe compact relay control of pumps and valves with 0-60 second time delay |
|
Optional strobe brings immediate attention to flow alarm conditions |
|
PP enclosure rated NEMA 4X with 300° swivel base for easy conduit alignment |
|
Easy setup with LED indicators for sensor, power and relay status |
|
Compatible with Flowline liquid or gas flow switch sensors |
|
|
|
Specifications |
|
Supply voltage: |
120/240 VAC, 50-60 Hz. |
|
Sensor input: |
(1) flow switch |
|
Strobe type: |
10_1: N/a
10_2: Xenon tube |
|
Contact type: |
(1) SPDT relay |
|
Contact rating: |
250 VAC @ 10A |
|
Contact delay: |
0-60 seconds |
|
LED indication: |
Sensor, power & relay status |
|
Electronics temp: |
F: -40° to 158°
C: -40° to 70° |
|
Enclosure material: |
10_1: PP (UL94VO)
10_2: PP (UL94VO) & PC |
|
Enclosure mount: |
3/4" NPT (3/4" Rp) |
|
Classification: |
General purpose |
|
Tech Tip
The AC powered relay controller has a 10A relay, adjustable time delay, LED indicators and NO or NC invert switch. The rugged NEMA 4X enclosure is made of UL approved fire retardant PP with a swivel base for conduit alignment.
|
|