| The general purpose two-wire ultrasonic transmitter provides non-contact level measurement up to 12' or 3.7 m, and is well suited for corrosive or ultrapure liquids. The transmitter is typically selected for light duty atmospheric day tank and process vessel applications. Media examples include ultrapure water, potable water and brine solutions. |
|
|
Simple compact sensor with fixed span and LED status indicator |
|
Two measurement ranges up to 3.7m with 3/4" and 2" transducers |
|
EasyCal simple push button calibration for all user set points |
|
PP enclosure rated NEMA 4X with rugged PVDF transducer |
|
Fail-safe intelligence with diagnostic feedback for easy troubleshooting |
|
| Tech Tip |
| For level measurement and control, package the transmitter with our universal panel meter. The panel meter is powered by 120 or 240 VAC and provides loop power for the transmitter. The meter features 2 or 4 relays with an isolated 4-20 mA repeater. |
 |
|
|
|
Specifications
|
|
Range:
|
LA15: 3.6" to 6' (9cm to 1.8m)
LA20: 6" to 12' (15cm to 3.7m)
|
|
Accuracy:
|
± 0.25% of span in air
|
|
Supply voltage:
|
12-36 VDC
|
|
Signal output:
|
4-20 mA, two-wire
|
|
Calibration:
|
None, fixed range
|
|
Process temp:
|
F: -40° to 140°
C: -40° to 60°
|
|
Pressure:
|
Atmospheric
|
|
Enclosure rating:
|
NEMA 4X (IP65)
|
|
Probe material:
|
PVC, PP or PVDF
|
|
Conduit:
|
1/2" NPT
|
|
Process mount:
|
LA15: 3/4" NPT (3/4" G)
LA20: 2" NPT (2" G)
|
|
Classification:
|
General purpose
|
|
|
|
|