| The general purpose three-wire ultrasonic transmitter provides non-contact level measurement up to 24' or 7.4m with an internal relay that can be configured as a single-point alarm or latched on two points for automatic fill or empty control. The transmitter is ideally suited for challenging corrosive or waste liquids and is typically selected for atmospheric bulk storage and waste sump applications. Media examples include wastewater and resin. |
|
|
Integral relay for alarm or automatic fill-empty control |
|
LED digital display indicates level in inches or centimeters |
|
EasyCal simple push button calibration for all user set points |
|
PP enclosure rated NEMA 4X with rugged PVDF transducer |
|
| Tech Tip |
| For applications with surface foam, turbulence or limited measurement space, install the transmitter in a 2" stand-pipe. |
 |
|
|
Specifications |
|
Range: |
6" to 24.5' (15cm to 7.4m) |
|
Accuracy: |
± 0.25% of span |
|
Display type: |
LED, 4-digit |
|
Beam cone: |
8° conical |
|
Dead band: |
6" (15cm) |
|
Supply voltage: |
14-36 VDC |
|
Signal output: |
4-20 mA, three-wire |
|
Calibration: |
Push button |
|
Process temp: |
F: -4° to 140°
C: -20° to 60° |
|
Pressure: |
30 psi (2 bar) |
|
Conduit: |
1/2" NPT |
|
Enclosure rating: |
NEMA 4X (IP65) |
|
Process mount: |
2" NPT (2" G) |
|
Trans. material |
PVDF |
|
Classification: |
General purpose |
|
|
|
|