| The general purpose two-wire pressure transmitter provides contact level measurement up to 30 psi or 2.0 bar and is ideally suited for relatively clean water, light oil or diluted corrosive liquids. The transmitter is typically selected for underground bulk storage, wet well, open channel or pond applications. Media examples include irrigation water and motor oil. |
|
 |
|
Rugged stainless steel transducer with flexible polyurethane cable |
|
Optional weight anchors sensor in turbulent or fast moving liquids |
|
Removable guard protects sensor from damage and process debris |
|
Optional installation kit for easy wiring termination and process mount |
|
| Tech Tip |
| For integral wiring termination and process mount, order the LD90 installation kit for use with your transmitter. Each kit includes a compact junction box, PP plug fitting and nylon cable connector. Its installation made simple. |
 |
|
|
|
Specifications |
|
Range: |
LD10: 7.5 psi (0.5 bar)
LD11: 15 psi (1 bar)
LD12: 30 psi (2 bar) |
|
Accuracy: |
± 0.25% of span |
|
Supply voltage: |
7 to 35 VDC |
|
Signal output: |
4-20 mA, two-wire |
|
Calibration: |
None, fixed span |
|
Process temp: |
F: -5° to 125°
C: -20° to 50° |
|
Burst pressure: |
> 35 x full span |
|
Enclosure rating: |
NEMA 6 (IP68) |
|
Trans. material: |
316 ss & 17-4 PH ss |
|
Cable material: |
Polyurethane |
|
Classification |
General purpose |
|
|
 |